Prime Dredge 45

The Prime Dredge 45 is a dredger is a CSD 450 of the highest quality available. This 18 inch dredger is therefore suitable to dredging in large rivers, sheltered area’s on the coastline and can perform activities such as sand mining, river training, harbour deepening, dredging of irrigation channels and much more.

Information Leaflet Prime Dredge 45

Production:                                     3000 m3/hour

Total Installed power:                 940 kW

Dredge installation

Dredge pump drive                    Caterpillar, Mitsubishi or Cummins

Power                                             709kW@1600rpm

Dredge pump                               GIW LSA / Warman

Cutter                                            ECTMarine 5 blades

Tooth system                               ESCO Ultralock

Cutter power                                110 kW

Cutter speed                                variable 0..30 rpm

 

Auxiliary drive

(Driving electric generator, winches, cutter & spuds)

Make                                             Caterpillar, Mitsubishi or Cummins

Power                                            232kW@1600rpm

Electric installation

Voltage                                          24V DC and 230V/400V AC

Electric generator                       20 KVA

Tank capacities

Fuel oil                                           16 m3

Standard Features

High efficiency dredge pump

Transportable by road

Heavy duty design

Low maintenance

Modular design

High quality components

Efficient fuel consumption

Luxurious operator cabin

Class approved construction

Main Dimensions

Length overall, ladder up:                 32 m

Length over pontoons:                       22 m

Breadth:                                                7,6 m

Dredging depth:                                  12 m

Suction pipe diameter:                      450 DN

Discharge pipe diameter:                  450 DN

Winches

Ladder winch

Line pull first layer:                            80 kN

Speed:                                                    0..20 m/min

Swing winches (2x)

Wire pull first layer:                            80 kN

Hauling speed:                                      0..20 m/min

Optional equipment

Production measurement

Monohull

Dredge monitoring tracking system

Electric / LNG

Increased dredging depth

Air conditioning

Plain suction front part

Spare parts package

Diesel generator set

Spud carrier system

Single engine set up

Anchorboom installation