Water Intake Dredging

Water Intake Dredging

Thousands of industrial facilities rely on large quantities of water from lakes, rivers, estuaries, or oceans to cool their operations. Intake structures that manage the flow of this water into the plants are essential to ensuring continuous and reliable processes. Since water is required for the operation, reliability and stable water flow are essential. Significant sediment deposits can blockage the water intakes.

Water Intake Dredging Tools

ECTMarine cutter suction dredger or plain suction are well suited for Cleaning of the water intake of industrial power plants regardless whether the project is in an urban or remote, tropical or frozen location.

North Pine Dam built in 1976 with a concrete spillway across the

Picture is North Pine Dam. Constructed in 1976, North Pine Dam, also known as Lake Samsonvale, is built across the North Pine River, five kilometers upstream from Petrie.

ECTMarine

Dredge solutions for Water Intake

CD40E-Arrangement-model-25m-5custom1_860x800_acf_cropped_860x800_acf_cropped

Plain Suction (Deep)

Plain suction dredging is a method used for maintenance dredging surrounding water installations. for added dredging depth an underwater pump is incorporated.  

Plaatje-standaard-dredgers_860x800_acf_cropped

Cutter Suction Dredger

Cutter suction dredgers are the most used type of dredgers and most widely applicable dredge tools.